Original Post Featured Posts Chinese companies sanctioned by US for South China Sea island-building 8/28/2020 Yuchengco-Virata consortium bags Sangley airport project 9/15/2022 Chinese companies sanctioned by US for South China Sea island-building 8/28/2020 Reshaping Cebu: Reclamation projects 2/13/2022 MGDC gets notice to proceed with bay reclamation 2/26/2021 MGDC gets notice to proceed with bay reclamation 2/26/2021 Palace: Sangley, all Chinese projects in Philippines to push through 9/1/2020 Samsung-backed group wins $11bn Philippine airport deal 9/15/2022 Samsung-backed group wins $11bn Philippine airport deal 9/15/2022 PBBM holds dialogue with 3 US private firms 9/20/2022 HIGHLIGHTS: President Bongbong Marcos inaugural speech 6/20/2022 DPWH to submit list of flood control projects to Marcos 7/28/2025 The Bataan-Cavite Interlink Bridge 3/5/2022 The Cebu Cordova Link Expressway is set to open to the public on April 28, 2022. Lezz Go Cebu! 4/2/2022 Philippines’ corruption probe expands to more infrastructure 9/23/2025